TMUA - Grimes Heights Survey - Tulsa
Once the preferred plan was determined, the project proceeded into the design phase. First, the area was surveyed. This included both topographic surveys for design and boundary surveys for writing and acquiring the necessary easements for the construction of the sewer mains. Then the preliminary plans were prepared and from these plans the easements were written.