CGA Engineers was awarded the contract to design improvements for MZ 3008 for the City of Tulsa and the Tulsa Metropolitan Utility Authority.  This project included waterline replacement, street reconstruction and street repairs.  Services also included topography and right of way surveys.

This project included school restrictions and limited right of way.  The waterline was designed with extensive use of horizontal bores to protect trees and reduce the number of driveway replacements.  Where open cuts across driveways were required, high early strength concrete was used to minimize the closer time and inconvenience to the home owners.

Waterline & Wastewater
  • 4,525 feet of 6" ductile iron pipe
  • 248 service connections
  • 12 fire hydrants
  • 29 gate valves
  • 1,041 linear feet of horizontal boring
  • Sanitary sewer slip lining 347 linear feet
Construction Cost - $1,558,742

Street Design
  • 8,400 CY of 6" PCC Pavements
  • 169 tons of asphalt Type B
  • 592 tons of asphalt Type A
  • 85 tons of ashpalt Type C
  • 1,855 SY of a 1/2 mile - patching, mill and overlay section
  • 1 mile - 26 foot wide street reconstruction
  • 72 wheel chair ramps at intersections
  • 15 new drainage inlet reconstructions
  • 1,753 SY of 4" sidewalks
  • 3,435 SY of solid slab sod
  • 3,168 CY of aggregate base type A
  • Reconstruction of residential driveways
  • Mill and overlay
  • Removal of obstructions
  • Traffic construction sequence
  • Crack sealing
  • Special provisions for school area
  • Other ancillary items involved adjustments, under-drain pipes, cross drains, replacement of truncated domes
Construction Cost - $2,187,990